ARRIVAL OF MV XING LUO 88
MV XING LUO 88 arrived and berthed at ECM Terminals Calabar on the 6th of April, 2024 Loaded with 17.200 metric tonnes of Breakbulk shipments of Project Cargo for a…
MV XING LUO 88 arrived and berthed at ECM Terminals Calabar on the 6th of April, 2024 Loaded with 17.200 metric tonnes of Breakbulk shipments of Project Cargo for a…
The vessel arrived on 22nd March 2024 with a cargo volume of 16,000 metric tonnes of Wheat (Bulk) for discharge operations. As usual, ECM Terminals swung into action and had…
At ECM Terminals Ltd, the safety of our customers’ cargoes is guaranteed at all times. These project equipment and materials are well assembled and protected in our Stacking Areas awaiting…